One Thousand Days Transformed - The Campaign for Cedarville
Image of Cedarville campus: Dixon ministry center, Cedar-lake and Biblical and Theological Studies Center are shown on a clear summer day

The 10-Year Campus Master Plan

The 10-year campus master plan is the practical outworking of a vision for future faithfulness. 沐浴在祈祷中, it represents the investment of thousands of hours of imagining, 研究, 讨论, 听, formulating a proposal that allows Cedarville to steward well the financial, 物理, academic resources that God has graciously provided.

This plan will change the look of Cedarville’s campus, enable us to increase the number and scope of academic programs, enlarge 大学’s capacity to affect the lives of undergraduate and graduate 学生 for the Word of God and the Testimony of Jesus Christ.

Over 11 months during the 2017–2018 academic year, 大学, in cooperation with planning partner the Collaborative, developed the master plan unveiled in this website.

This process included input from more than 3,000年教师, 工作人员, 学生, 校友, 社区成员, friends of 大学. It involved a detailed and thorough analysis of Cedarville’s existing buildings and campus space, 并提出了建议 相应的, from beautification projects such as a gateway arch to show the boundary of campus to large-scale infrastructure like the new 沙恩伯格商务中心.

The Cedarville University leadership team dedicated heart, 灵魂, 心, strength to developing this plan because they knew it was more than a proposal for new buildings. Ultimately, it is an act of obedient faithfulness to King Jesus, who is the founder 也是雪松镇的维护者.

Throughout this website, six major building projects will be introduced: a 菲尔餐厅, 282个床位的宿舍, 土木工程大楼, Athletic and Academic Expansion, Lorne C. 沙恩伯格商务中心, Classrooms and Academic Offices. This 10-year master plan also includes projects that will make the campus easier to navigate, 更美丽, even more welcoming than it currently is. Cedarville will look very different by 2029. But it will also be positioned for years to come as a University where 学生’ lives are transformed through excellent education and intentional discipleship in submission to biblical authority.

Classrooms and Academic Offices

This stately new facility will join several outstanding academic departments under one dome.

The New Business Building to Be Built on Campus

Lorne C. 沙恩伯格商务中心

This multi-level facility will showcase the School of Business Administration and increase conference capacity.

The New Callan Extension to Be Built on Campus

Athletic and Academic Expansion

COMPLETED 5/22 – This two-story expansion houses a new weight room, 团队室, office/classroom space for the new Master of Athletic Training and PA Studies graduate programs.

The New 土木工程大楼

土木工程中心

COMPLETED 8/20 – This dedicated lab and instruction space houses the new and growing civil engineering major.

The New 菲尔 on Campus

菲尔

COMPLETED 8/20 – The new 300-seat dining and campus community facility overlooks Cedar Lake.

The New Residence Hall to Be Built on Campus

Bates-Dunn-Parker

COMPLETED 8/20 – New residence hall provides generous community spaces to serve the needs of a growing student body.

教堂的扩张

耶利米教堂扩建

COMPLETED 8/19 – An additional 300 seats have been added to the Jeremiah 教堂.

Warren and Betty Wiersbe 图书馆 and Reading Room

COMPLETED 8/19 – The 图书馆 houses the vast personal library of one of the foremost Bible teachers, professors and authors of the 20th century.

Cedarville's masterplan for building projects